Notre expérience en matière de projets
Découvrez nos projets d'énergie renouvelable à travers le continent.
Kronos
Kronos by EDPR
EDPR
Cluster
ic_nature_summer
Operational
ic_power_maintainance
Construction
ic_settings_gear
Late-stage development
ic_actions_arrow_reload
Under development
*Numbers utilized on the project location pins indicate the quantity of projects in that specific area. 
Filters
Clear search
Clear search
Project list
Schleife photo
ic_settings_gear
Late-stage development
Kronos by EDPR
Schleife
The "Hochkippe Nochten" solar park is expected to be built in December 2024 in Brandenburg, approx. 33 km south of Cottbus, in the municipal area of the town of Schleife, and is expected to generate ? MWp. The 55-hectare site is suitable for a free-standing solar plant.
54 MWp
Projects_GE
ic_settings_gear
Late-stage development
Kronos by EDPR
Ketzin
The "Solarpark am Gewerbegebiet Etzin" (solar park at the Etzin industrial estate) will be built soon in Brandenburg, west of Berlin, in the municipal area of the town of Ketzin/Havel, and is expected to achieve an output of 92 MWp. The 64-hectare site is suitable for a free-standing solar plant.
92 MWp
Meuselwitz I photo
ic_settings_gear
Late-stage development
Kronos
Meuselwitz I
The "Solarpark Meuselwitz" of the city of Meuselwitz is expected to be built at the end of 2024 in Thuringia, approx. 30 km south of Leipzig, and is expected to achieve an output of 65 MWp. The 51-hectare site is suitable for a free-standing solar plant.
65 MWp
Berkelland 2
ic_nature_summer
Operational
Kronos by EDPR
Berkelland 2
Located in Berkelland Municipality, in the centre-east province of Gelderland, the new solar projects will have an installed capacity of 16 MWp and more than 25 thousand bifacial solar photovoltaic panels, a technology that allows the solar irradiation to be harnessed from both sides of the panel, thus maximizing renewable production.
16 MWp
photo berklland 1
ic_nature_summer
Operational
Kronos
Berkelland 1
Located in Berkelland Municipality, in the centre-east province of Gelderland, the new solar projects has an installed capacity of 13 MWp and more than 20 thousand bifacial solar photovoltaic panels, The project will be able to produce enough electricity to supply around 4,000 households per year. This clean energy will also avoid the emission of more than 2,000 tons of CO2 annually in Gelderland, thus seizing the solar potential of the region and maximizing its transition to cleaner energy.
13 MWp
venoy photo
ic_power_maintainance
Construction
Kronos by EDPR
Venoy
Located in a commune in the Yonne department in Bourgogne-Franche-Comté in north-central France. The new solar project will have an installed capacity of 19MWp and more than 30 thousand bifacial solar photovoltaic panels, a technology that allows the solar irradiation to be harnessed from both sides of the panel, thus maximizing renewable production.
19MWp